Oil and gas

  • Region South: Preheater for landing station, basic and detail engineering, apparatus, technical planning, steel construction planning, pipeline planning
  • Region South: Upgrading of the compressor station: Detail pipeline planning with PDMS, planning of fresh and exhaust steam pipe
  • Region South: Feasibility study of the routes within the framework of the network development plan, pipe stress analyses, consultation

Bilfinger Engineering & Maintenance GmbH

Bilfinger Engineering & Maintenance GmbH

Phone: +49 621 6506 0

info.bm*Please remove text between *, this is a spam protection*@bilfinger.com
Print