Bilfinger Peters Engineering

Navigation
Chemical & Petrochemical

Chemical & Petrochemical

New plants for Agrochemicals

  • Basic & detailed engineering 
  • 3D plant design incl. laser scanning
  • 3,800 pipes, 580 equipments,
    2,800 special supports

 

Complete Plant Modification

  • Complex plant modifications for integrated operational clusters 
  • Concept design/detail design
  • Realization of PE and PCE Planning 

 

 Pressure Protection Systems

  • 250 security valve systems p.a.
  • 20 burst disk systems p.a.
  • 40 tank protection mechanisms p.a.
  • 120 pressure loss calculations p.a.

 

Tank Farm for Agrochemicals

  • Plant design on-site 
  • 3D modelling:
    - 9 tanks, 20 equipments
    - 200 pipes, 1,000 supports

Tank farm for Basic Chemicals

  • Construction engineering layout
  • Dimensioning of tank basins/flares
  • Proof/design of pile foundation
  • 250 tons total steelwork

 

General Tank Farm Extension 

  • Authority engineering, WHG proof
  • Creation of formwork & reinforcement plans
  • Pipe bridge dimensioning/creation of workshop drawings 

 Periodic Inspections 

  • 20 DIN ISO 9712-certified employees 
  • Periodic pipe inspection: (annual data)
  • 350 km on infrastructure pipe bridges,
    100 km within the plants

 

Tanker Jetty

  • Basic & detail engineering incl. preparation for A3 certification
  • Water hammer calculations
  • Layout and design of 8 loading arms for tankers with 4000t/max. 135m 

Support of Daily Business 

  • Design support at the client’s site
  • Concept design and updates
  • Check of security concepts
  • Optimization/debottlenecking

Maintenance and Documentation

  • PI&D control and maintenance
  • As-built documentation
  • Onsite inspections of equipment, valves, pipes, labels